Construction cost estimation workflow
Skill manualsReview draft
On this page
Identify work items, materials, and estimate assumptions from an architectural, interior, or landscape proposal, producing a cost table and explanatory images.
Prepare materials
Supply renderings, city, scope, and scale. Add building area, stories, and height, or actual fit-out/landscape area and quality level. Include material schedules, rates, or client budgets. Define exactly which works are included.
Build the estimate
- Select this Skill and define the question, such as facade works excluding the main structure, using a supplied area table.
- Check identified structure, materials, and work items. Correct similar-looking but differently priced materials before comparing totals.
- Verify quantity and area sources. Prefer supplied data; keep image-derived quantities and proportions explicit as assumptions.
- Check region, date, specification, and scope of price references. Review the suitability of neighboring-city or experience-based rates.
- Check subtotals, units, inclusions, and explanatory details. Discuss alternatives for expensive items instead of simply reducing the total.
Use the estimate
This supports design-stage comparison and identification of cost drivers. Images do not establish full quantities, hidden construction, or site conditions; illustrative details are not construction drawings. Replace assumptions with actual areas, specifications, and quotations as design develops.
For choosing designs within a fixed ceiling, use Budget-constrained design and cost coordination.